ARTWORK MAP / 01
Base artwork
The continuous visual layer: colour, image and type—built to the approved size and substrate assumptions.
- Use the agreed colour mode and scale.
- Keep critical content inside the reviewed safety area.
SERVICE 05 / FINISHING & EMBELLISHMENT
Protection, reflection, dimension and final form—selected only after the material, artwork, construction and intended use are understood.
CURATORIAL PRINCIPLE
It should protect, direct light, create hierarchy or complete the physical object. If it does none of those things, it does not belong.
Finishing is not a decorative afterthought. It changes how a piece is handled, read, assembled and experienced. HDC reviews the complete job before confirming the appropriate route, sequence and achievable result.
Availability and method remain job-specific.
SELECT BY INTENT
Use the index as a creative starting point. The final specification follows material and production review.
FINISHING FAMILIES
Each family can shift appearance, performance or construction. Open the ledger to see what the result asks from the job.
Film, coating or overlaminate can change sheen, hand-feel and surface resilience. It should be chosen around the actual stock or substrate, folds, handling and environment.
A controlled metallic accent can create contrast without covering the whole piece. The route may be conventional or digital after the stock, coverage, geometry and quantity are reviewed.
Raised, recessed or built-up effects turn visual hierarchy into a tactile one. Material thickness and the reverse side of the piece are part of the design decision.
A selective effect can direct the eye, separate image areas or add tactile contrast. It is an effect layer—not a universal durability claim.
The perimeter is part of the artwork. Contours, corners, apertures, drilled points, folded returns and mounting details should be resolved before production.
BUILD THE FILE LIKE THE OBJECT
Clear layer logic helps artwork, finishing and fabrication stay aligned through production review.
ARTWORK MAP / 01
The continuous visual layer: colour, image and type—built to the approved size and substrate assumptions.
ARTWORK MAP / 02
A separately named opacity layer may be needed for clear, coloured or dark surfaces when the confirmed route supports it.
ARTWORK MAP / 03
Spot varnish, raised detail, metallic or texture instructions should be isolated from the base artwork and named unambiguously.
ARTWORK MAP / 04
Final contours, apertures and routing paths belong on their own production layer, separate from visible artwork.
ARTWORK MAP / 05
Drill points, fixings, folds, scores, glue areas and no-print zones communicate how the finished piece must function.
This map explains file logic; it is not a visual proof or production guarantee.
METHOD COMPARATOR
These are starting territories for discussion. HDC confirms the production route after reviewing the complete job.
| Desired result | Starting territory | Review before confirmation |
|---|---|---|
| Quiet protection or changed sheen | Lamination, coating or application-specific overlaminate | Stock, folds, adhesion, handling and environment |
| Metallic focal point | Foil or another reviewed metallic route | Stock, coverage, detail, registration, construction and quantity |
| Tactile hierarchy | Emboss, deboss, raised clear or layered relief | Material body, reverse-side impact, detail scale and use |
| Clean silhouette or aperture | Die cut, contour cut or routing | Material, radius, tolerance, nesting and edge expectation |
| Installation-ready object | Edge treatment, drilling, folds, returns, mount or frame | Substrate, load, fixing method, access and location |
FROM INTENT TO INSPECTION
Name the role: protect, reflect, add dimension or complete the form.
Check the stock, substrate, geometry, handling and environment.
Separate base, white, effect, cut and installation information.
Review representative output where the material and risk require it.
Produce in the agreed sequence, then check the final physical result.
PROJECT ENQUIRY
To review a finish properly, share the project conditions rather than a finish name alone.
HDC confirms suitability, availability and production scope from the actual job before release.